AMO-A200&A200S AUTOMATIC BENDING MACHINE

For the new products, the system for new adjustment will be bending speed, precision, bending efficiency better play

Consistent depth   Stable and reliable  Adjustment-free

Different thicknesses of materials can be processed without adjusting the depth ofslottingNo need to adjust again even after tool change

Overall cast-type slotting structure,Equipped with customized server drivers,form high strength slotting system

Persistence is competent for wide&thick materials

A200S

Add milling cutter configuration on the basis of A200 mode
Special design of feed channel, knife edge and bent blade structure according to material specifications

The feeding axis upgraded to N.M hybrid stepping motor Significant increase in feeding speed & No lag when feeding heavy materials


REQUEST A QUOTE

Category: Brand:
Description

For the new products, the system for new adjustment will be bending speed, precision, bending efficiency better play

Consistent depth   Stable and reliable  Adjustment-free

Different thicknesses of materials can be processed without adjusting the depth ofslottingNo need to adjust again even after tool change

Overall cast-type slotting structure,Equipped with customized server drivers,form high strength slotting system

Persistence is competent for wide&thick materials

A200S

Add milling cutter configuration on the basis of A200 mode
Special design of feed channel, knife edge and bent blade structure according to material specifications

The feeding axis upgraded to N.M hybrid stepping motor Significant increase in feeding speed & No lag when feeding heavy materials

 

Shipping and Delivery

Processing Time

Orders will be arranged for shipment within 1–3 business days from our China warehouse. Customized goods require extra production lead time accordingly.

Shipping Options & Estimated Transit

    • Economy Air: approx 12–25 working days
    • Standard Line: approx 7–12 working days
    • DHL/Fedex/UPS: approx 3–7 working days
    • Sea Freight: approx 25–45 days for bulk machinery

       Note: All transit days are estimated only, not guaranteed.

Cost & Customs Duty

Shipping cost is auto calculated at checkout based on weight and destination. Any local import tax/VAT shall be borne by buyers.

Delay Disclaimer

Shipment delay may occur due to customs inspection, airline adjustment, bad weather, peak season or other uncontrollable factors out of our scope. We reserve the final right of explanation for delivery schedule and will assist to track parcels actively.

Tracking

Tracking info will be sent to your email within 24h after dispatch.