AMO-AT800 SPECIAL-SHAPED MARKING INDUSTRIAL BENDING MACHINE

INDUSTRIAL LATHE-BED

AT 800 adopts industrial bed structure design, high rigidity,

low vibration, long-term use is not easy to deform.

HIGH POWER FULL SERVO SYSTEM

Feeding axis- Slotting axis- Depth axis- Bending axis.Customized servo system is configured, stable operation, reliable performance, fast response speed, low failure rate.

Carbide alloy planer as slotted tools Blade double side with 8 knife edges, no need to sharpen the knife.

Cooperate with oil mist automatic injection device, increase lubrication function Ensure the slotting effect is smooth and flat.

Set in front and back two sets of manipulator gripping material progressive work. Manipulators are designed with 1:2 lever Strong clamping of the material to eliminate the phenomenon of feeding skid Progressive feeding structure, which can effectively reduce material waste.

Servo Drive System+High Quality Linear Guide rail and ball screw drive system, made the feeding smooth and powerful.


REQUEST A QUOTE

Category: Brand:
Description

 

INDUSTRIAL LATHE-BED

AT 800 adopts industrial bed structure design, high rigidity,

low vibration, long-term use is not easy to deform.

HIGH POWER FULL SERVO SYSTEM

Feeding axis- Slotting axis- Depth axis- Bending axis.Customized servo system is configured, stable operation, reliable performance, fast response speed, low failure rate.

Carbide alloy planer as slotted tools Blade double side with 8 knife edges, no need to sharpen the knife.

Cooperate with oil mist automatic injection device, increase lubrication function Ensure the slotting effect is smooth and flat.

Set in front and back two sets of manipulator gripping material progressive work. Manipulators are designed with 1:2 lever Strong clamping of the material to eliminate the phenomenon of feeding skid Progressive feeding structure, which can effectively reduce material waste.

Servo Drive System+High Quality Linear Guide rail and ball screw drive system, made the feeding smooth and powerful.

 

 

 

Shipping and Delivery

Processing Time

Orders will be arranged for shipment within 1–3 business days from our China warehouse. Customized goods require extra production lead time accordingly.

Shipping Options & Estimated Transit

    • Economy Air: approx 12–25 working days
    • Standard Line: approx 7–12 working days
    • DHL/Fedex/UPS: approx 3–7 working days
    • Sea Freight: approx 25–45 days for bulk machinery

       Note: All transit days are estimated only, not guaranteed.

Cost & Customs Duty

Shipping cost is auto calculated at checkout based on weight and destination. Any local import tax/VAT shall be borne by buyers.

Delay Disclaimer

Shipment delay may occur due to customs inspection, airline adjustment, bad weather, peak season or other uncontrollable factors out of our scope. We reserve the final right of explanation for delivery schedule and will assist to track parcels actively.

Tracking

Tracking info will be sent to your email within 24h after dispatch.